CompleteGATE Doubts Forum
0 like 0 dislike
641 views
The SRS document produced at the end of requirement analysis phase is called _______________ specification

1) black box

2) white box

3) unit

4) alpha
asked Jun 18, 2016 in Software Engineering by CompleteGATE-AskUS (3,550 points) | 641 views

1 Answer

0 like 0 dislike

The SRS document produced at the end of requirement analysis phase is called BLACK BOX specification, because it does not look into the code.

answered Jun 22, 2016 by Shweta Nagpal (1,550 points)
Welcome to Completegate AskUs, A place where you can ask questions regarding videos located at Youtube Channel and receive answers from our experts.

Sign up for our newsletter to receive the latest news and event postings.

Best Users 08/2019
  1. CompleteGATE-AskUS

    3550 Points

  2. Asma Abbasi

    200 Points

  3. Henry

    150 Points

  4. SilverChat

    140 Points

Rewards per month
First Winner: 0 INR (Not Started)
Second Winner: 0 INR (Not Started)

×

Like us on Facebook

Show your Support. Become a FAN!

107 questions
100 answers
2 comments
59 users